| Bridge No. | Bridge Name | Authority | Span Arrangement (m) | Total Length (m) | Total | Status | Bridge Type |
| Width (m) |
| 1 | Dharmapuri- 138+875_Palkhi Mahamarg_RKCIPL | NHAI | 1 x 60 | 60 | 16 | In Progress | Highway bridge |
| 2 | Turbhe ROB Vashi-Panvel (Mumbai)-SMC infra | PWD Maharashtra | 17 x 30 | 510 | 11.6289 | In Progress | Flyover |
| 3 | Turbhe ROB Vashi-Thane (Mumbai)-SMC infra | PWD Maharashtra | 10 x 30 | 300 | 11.6289 | In Progress | Flyover |
| 4 | Turbhe ROB Vashi-Juinagar (Mumbai)_SMC infra | PWD Maharashtra | 11 x 30 | 330 | 11.6289 | In Progress | Flyover |
| 5 | Indora Flyover_Nagpur_NCC | NHAI | VARIOUS spans of 60 m, 80m and 90 m with total bridge length of 5950 m | In Progress | Flyover |
| 6 | Thirunavaya Bridge, Kerala-ULCC | RBDCK, Govt of Kerala | 13 x 62 | 806 | 11 | In Progress | Highway Bridge |
| 7 | UHPFRC Blocks for Testing | DRDO | Various Sizes UHPFRC Blocks | In Progress | R& D Test |
| 8 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway_ J M Mhatre (83+975)_JMMIPL | NHAI | 4×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 9 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway_(84+645)_JMMIPL | NHAI | 4×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 10 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway 90+453_JMMIPL | NHAI | 4×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 11 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway 93+150_JMMIPL | NHAI | 4×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 12 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway 81+497_JMMIPL | NHAI | 2×37.5+3×33.3 | 174.9 | 25 | In Progress | Highway Bridge |
| 13 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway_89+380_JMMIPL | NHAI | 2×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 14 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway_90+900_JMMIPL | NHAI | 2×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 15 | Major Bridges on Kolhapur- Ratnagiri 4 Lane Highway_91+155_JMMIPL | NHAI | 2×37.5 | 150 | 25 | In Progress | Highway Bridge |
| 16 | Missing Link Project on Mumbai Pune Expressway._Mumbai Side_Koncretech (Navyuga) | Navyuga – MSRDC | 8 x 25 + 35 | 235 | 24.95 x 2 | In Progress | Viaduct |
| 17 | Missing Link Project on Mumbai Pune Expressway_Pune Side_Koncretech (Navyuga) | Navyuga – MSRDC | 8 x 25 + 35 | 235 | 24.95 x 2 | In Progress | Viaduct |
| 18 | Taloja Creek Br. (Reconstruction) | PWD, Maharashtra | 2 x 67.06 | 134.12 | 13.55 | In Progress | Creek/highway Bridge |
| 19 | Taloja Creek Br. (Span Replacement) | PWD Maharashtra | 2 x 33 | 66 | 8.25 | In Progress | Creek/highway Bridge |
| 20 | Bhoj Morbe Pkg. 17 Major Bridge_RKC | NHAI | 2 x 21.25 | 95 | 3 x 31.76 | In Progress | Highway Bridge |
| 21 | FORMULA 3 Race track Buildings_Five Star Shiving | Private | 4 Type Of Building with UHPFRC Precast Columns, Beams, Rafters & Slabs | In Progress | Building |
| 22 | Firodia Bridges Major Bridge_Force Motor | Private | 3×15 | 45 | | In Progress | Overpass |
| 23 | Firodia Bridges Entry Bridge_Force Motor | Private | 4×15 | 60 | | In Progress | Overpass |
| 24 | Coastal Road Airport Link Road FOB_M_JMMIPL | MH-PWD | 3×38.5 | 120 | | In Progress | Viaduct |
| 25 | Coastal Road Airport Link Road FOB__JMMIPL | MH-PWD | 1×33.0 | 33 | | In Progress | Viaduct |
| 26 | Rewa Bypass Canal Bridge_Udit Infra | NHAI | 70×1 | 70 | 12.5 | In Progress | Highway Bridge |
| 27 | Port Road Improvement 0+433_Vizag (AP)-ATIPL | NHAI | 1×57 | 57 | 11.5 | In Progress | Viaduct |
| 28 | Port Road Convent Nagar 2+465/447_Vizag (AP) -ATIPL | NHAI | 2×45 | 90 | 11.5 | In Progress | Viaduct |
| 29 | Port Road Convent Nagar 0+458_Vizag (AP) -ATIPL | NHAI | 1×67 | 67 | 11.5 | In Progress | Viaduct |
| 30 | Port Road Convent Nagar 0+683_Vizag (AP) -ATIPL | NHAI | 1×65 | 65 | 11.5 | In Progress | Viaduct |
| 31 | Port Road Convent Nagar 1+220_Vizag (AP) -ATIPL | NHAI | 2×70 | 140 | 11.5 | In Progress | Viaduct |
| 32 | Jowai-Meghalaya Assam Border MH-44 Bridges Overlay Meghalaya | NHAI | 2×90 | 180 | 10.5 | In Progress | Highway Bridge |
| 33 | Mamurdi Pavana River Bridge Pune_ARC | PCMC_Pune | 2×30+1×20.5+3×30+4×30+1×60 | 310 | 15 | In Progress | River Bridge |
| 34 | Reshambaugh square to KDK college Nagpur_Miral Infra | IOCL | 1X60 | 60 | 12 | In Progress | Flyover |
| 35 | Reshambaugh square to KDK college Nagpur_Miral Infra | IOCL | 1X68 | 68 | 12 | In Progress | Flyover |
| 36 | Two-lane road over the bridge from IOCL to Nirmal Nagar Connecting to Hasanbaugh and KDK College in Nagpur | IOCL | 2X60 | 60 | 12 | In Progress | Flyover |
| 37 | Two-lane road over the bridge from IOCL to Nirmal Nagar Connecting to Hasanbaugh and KDK College in Nagpur | IOCL | 1X55 | 55 | 12 | In Progress | Flyover |
| 38 | Two-lane road over the bridge from IOCL to Nirmal Nagar Connecting to Hasanbaugh and KDK College in Nagpur | IOCL | 4X40 | 40 | 12 | In Progress | Flyover |
| 39 | Hadpsar-ROB | PMC | 1X57.2 | 57 | 12.5 | In Progress | ROB |
| 40 | Hanumangarh – ROB | NHAI | 1X62 | 62 | 13.8 | In Progress | ROB |
| 41 | Anand Nagar to Saket Projet_Thane Mumbai | NHAI | 2×55 | 55 | 25 | In Progress | Flyover |
| 42 | Anand Nagar to Saket Projec_thane Mumbai | NHAI | 1×85 | 85 | 25 | In Progress | Flyover |
| 43 | Bhatsa River Bridge Kalyan_Man Infra_ -Mumbai | MH-PWD | 4×36 | 36 | 12 | In Progress | Highway bridge |
| 44 | Mhalngi Flyover_Nagpur_KCC | MH-PWD | | | | In Progress | Flyover |
| 45 | Kalamboli Junction Flyover_Mumbai_Thakur Infra | MH-PWD | VARIOUS spans of 60 m, 80m and 90 m with total bridge length of 5550 m | In Progress | Interchange Passes |
| 46 | Interchange_Multimodal Logistic Part at Nagpur_D.P. JAGTAP | NHLML | 1×65 | 65 | 19.8 | In Progress | Interchange Passes |
| 47 | Staircases for Berthing Place_(BB-4) | JNPA-Mumbai | Stair Cases | In Progress | Jetty Work |
| 48 | Metro Station’s Girders_DMRC Delhi | DMRC-Delhi | 25×15 | 375 | 25 | In Progress | Elevated Metro Stations |